搜索答案

单选题 In a typical electric desalination process flow, the mixer installation position is ( ).

A、 in front of the original oil pump
B、 in front of the first electric desalting tank
C、 after the primary electric desalting tank
D、 before water injection inlet

微信扫一扫
扫一扫下载APP
微信小程序答题 下载APP答题
由4l***ds提供 分享 举报 纠错

相关试题

单选题 A gas explosiometer measures the ( ) of combustible gases.

A、 lower explosive limit
B、 Upper explosive limit
C、 explosion limit range
D、 mass concentration

单选题 ( ) Does not fall under fall protection.

A、 Safety belt
B、 Safety net
C、 hard hat
D、 Safety rope

单选题 High work means work performed above the fall height datum ( ) (inclusive), where there is a possibility of falling.

A、 2 m
B、 2.5m
C、 3 m
D、 5 m

单选题 When the chemical equipment is hot repair, the medium that can not be directly used to replace the combustible gas is ( ).

A、 helium
B、 Nitrogen
C、 Argon
D、 Air

单选题 For ( ) (including) above high work, the "high work permit" should be applied.

A、 10 m
B、 15 m
C、 20 m
D、 30 m

单选题 For hot operation in the no-fire zone, the distance between the oxygen cylinder and the acetylene cylinder is at least ( ) meters.

A、 2
B、 3
C、 4
D、 5

单选题 When doing hot fire analysis, the interval between sampling and hot fire is more than ( ) minutes, or the stop time in the middle of hot work is more than ( ) minutes, you must resamb for analysis.

A、 30,30
B、 30,60
C、 60,30
D、 60,60

单选题 When the height of the high work is ( ) m, it is called the level 2 high work.

A、 2 ~ 10
B、 5 to 10
C、 5 to 15
D、 10 to 15