( ) should be used before starting the metering pump.
The metering pump should be turned off slowly after starting normally ( ).
Pump flow regulator should be set to ( ) before starting metering pump.
What is wrong with the following statement about the operation of the stop-metering pump is ( ).
The following is correct about the operation of the shutdown metering pump ( ).
Flow regulator should be set to ( ) after stopping metering pump.
The following about the operation of the stop metering pump is wrong ( ).
Vacuum pump before opening the pump the wrong operation is ( ).
If the following conditions occur after the vacuum pump starts, do not need to stop the pump immediately is ( ).
If the following situation occurs after the vacuum pump starts, do not need to stop the pump immediately is ( ).
Vacuum pump after opening the pump check for the wrong operation is ( ).
Vacuum pump stop pump operation, the following is correct ( ).
Vacuum pump stop pump operation, the following is wrong ( ).
Vacuum pump stop pump operation, the following practice is wrong ( ).
When the vacuum pump is operating normally, the error is ( ).